6.2.2 Electricity
- The building should have a three-phase line and all power cables should be in good condition.
- The power meter should be in working condition and be able to take on any additional power load needed by CARE.
- All electrical outlets must be safe and leak-proof.
- The capacity to accommodate a heavy duty generator should exist.
- All outstanding electricity bills should be paid by the landlord before the building is handed over.